From rendering
to reality.
A full gut-and-rebuild for the Silvestri family: a walk-in shower, new vanity, and tile that turned out just as good as the plan said it would.
We planned it on screen. We built it by hand.
Before a single tile went up, this bathroom existed only as a mockup: a walk-in shower with a sliding glass door, a niche for shampoo, a 24-inch vanity, and green handcrafted tile running wall to wall.
Under a fixed-fee contract, we gutted the space down to the studs, waterproofed the shower pan, ran new supply lines, and rebuilt it tile by tile until the room in front of you matched the room on the page.
Here's how the plan became the finished bathroom.
What we designed before we built
The mockup set the target: layout, tile, fixtures, and finishes, all worked out before demo day.
Studs to finished room
Drag the slider to see the same corner of the bathroom, gutted down to the framing and then finished to plan.
Same walk-in shower and toilet space, before demo and after final walkthrough.
What went into it
- Full demo to the studs
- Shower pan waterproofing
- Walk-in shower with sliding glass door
- Handcrafted wall tile, floor to ceiling
- New toilet, supply lines, and flange
- Vanity install with new sink supply lines
- Vent fan and light install
- Chrome fixtures and trim, finished to plan
Have a bathroom stuck at the planning stage?
We'll help you design it, price it under a fixed-fee contract, and build it out to match.
Book a consultation